IRAN CONSTRUCTION RESEARCH فارسـی

Airport Projects

Comperhensive Planning for Bandar Abbas International Airport (2009- 2012)
Comperhensive Planning for Bandar Abbas International Airport (2009- 2012)

Review of reports and studies for Bandar Abbas International Airport, study of existing situation, foresighting future requiremen…... more

Tabriz Airport Hadj pilgrimage and International Terminal (2000 – 2002)
Tabriz Airport Hadj pilgrimage and International Terminal (2000 – 2002)

International Terminal building for Tabriz Airport based on some prediction of hosting about 800 passenger as expected of two sim…... more

Aboumoosa Airport (1996 – 1998)
Aboumoosa Airport (1996 – 1998)

Engineering services included completion of detailing and supervision of construction of control tower, fire fighting , meteorolo…... more

Iran Air Engine Workshop Extension at Mehrabad Airport (1996 – 1997)
Iran Air Engine Workshop Extension at Mehrabad Airport (1996 – 1997)

Design of extension to the old building adjacent to the engine workshop (APU) in four stories with a 520sq.m.  main space an…... more

Iran Air Repair and Maintenance facilities in Imam Khomeini International Airport (1996 – 1998)
Iran Air Repair and Maintenance facilities in Imam Khomeini International Airport (1996 – 1998)

This complex as a logistic center devoted to airport services of Iran Air at Imam Khomeini International Airport (IKIA). The buil…... more

Ardebil Airport Terminal and  Ancillary Buildings (1999 – 2000)
Ardebil Airport Terminal and Ancillary Buildings (1999 – 2000)

Studies, design and supervisory services for Ardebil Airport buildings comprising terminal, technical block, fire fighting facili…... more

Saravan Airport Terminal and Ancillary Buildings 1990 – 1991
Saravan Airport Terminal and Ancillary Buildings 1990 – 1991

Basic studies and survey for design of the airport terminal are based on international criteria and standards. Preparation of sit…... more

All rights reserved for ICR