Building of the Faculty of Road Engineering, Iran University of Science and Technology

At the end of 1994, the design and supervision of the construction project of the first school of railway engineering in Iran was entrusted to the consulting engineers of construction research in Iran. Preliminary and initial stages of work, such as determining the location of the land and its location on the campus of Iran University of Science and Technology, have already been done, while plans for this purpose have been prepared by a qualified consulting engineer and accordingly even part of structural operations including Founding and erecting a number of columns

It was done. However, with the emphasis of the Program and Budget Organization, it was decided that this should be done by a consulting engineering company with architectural expertise and competent in designing educational buildings..

The budget for the construction project of the Faculty of Railway Engineering was provided in the form of the credit of the Bafgh-Bandar Abbas railway project. During 12 years, time has been active in all organizational stations, grade 2.1 and this axis in various ways

.

Initially, preliminary studies to determine the levels of building design, in continuous coordination with the establishment of the faculty and the executive body of the project (Deputy Minister of Building and Railway Network Development) and considering the basic points and objectives of the project began as follows:

 

- Providing the required manpower for the railway at the bachelor's and master's levels, providing consulting services and

Retraining and conducting applied research, holding conferences and scientific, specialized, international and other seminars

Scientific and industrial activities in the field of railways

Holding undergraduate courses in three groups of line and building engineering, flow engineering, exploitation engineering and two

Electrical line engineering and railway electrical signal engineering

- Annual admission of undergraduate students for all disciplines to 111 people and graduate students

At least 11 people

Mechanical

Cooling, heating and ventilation systems (HVAC) (as a combination of central air conditioners, fresh air and fan coil) ground, duct (used for major spaces. Two air conditioners are installed in the level of 12:11 + and for the library and meeting hall from The all-air system is operated with the help of two independent air-conditioners for each of them. Equivalent to 66% of their capacity is considered as STAND BY

.

Drinking water, drinking water and sanitation from the city water network and non-drinking water consumption from underground wells in the university campus into elevated air tanks have been distributed to various buildings, including the building of the Faculty of Railway Engineering.

.

- The sewage building of the faculty is connected to the sewage network of the university campus

.



Urban Sustainability Development